Related information
- What about the precision coating Machine, and the graphene thermal conductive film?
- Slit coating technology is the solution film forming technology for flat panel display Most important in technology
- Quantum dot film coating precision process control
- Memory electrochromic film changes the color of the lens by light perception a>
- The domestic substitution of aluminum-plastic film has become a trend, and the market share Speed up
- Preparation of amorphous polyacid solution by low temperature inkjet printing Flexible Electrochromic
- Quantum Dot Film:"Advanced Cosmetics" of the Display World
- Understand the market prospect of my country's aluminum-plastic film
- Optical Film Industry Analysis
- Aluminum-plastic composite film-the neglected "profiteering" market
-
Product Details
-
Contact Us
UV type OCA optical adhesive coating compound Equipment,
Main technical indicators
1.Coating substrate:PET/release film substrate thickness:25-200μm substrate width:maximum 800-1600mm
2.Composite substrate:release film substrate thickness:25-200μm substrate width:maximum 800-1600mm
3.Coating method:roll/slot
4.Coating slurry characteristics:full solid UV pressure sensitive adhesive, viscosity 200-10000CPS
5.Dry glue thickness range:50um-500un
6.Solvent Type:None
7.Guide rollers:non-driven guide rollers adopt oil bath type)
8.Mechanical speed:60m/min, normal production speed 5-50m/min
9.Tension control:floating roller + sensor double closed-loop control
10.Tension range:1-30kgf/full width (depending on the thickness of the substrate)
11.Loading structure of rewinding and unwinding:safety chuck/air cap
12.Rewinding and unwinding diameter:Max800-1000㎜ (AGV can be reserved in design)
13.Inflatable shaft specification:3 inches/6 inches (can be configured with inflatable sleeve)
14.UV box length:40m (5m section*8)
15.UV box temperature control:20-35℃, cooling method:air cooling
16.Power voltage:380V-50Hz-3P
17.Air pressure:5kg/cm2 (Max.7kg/cm2)
18.The main steel frame:made of rectangular steel, the Equipment, is installed in a 10,000-level clean room
19.Process flow:
Second Unwind→Storage→Dust
Unwinding→Storage→Dust→Incoming Traction→Roller/Slit→UV→Deflection→Traction→Storage→Outlet Traction→Thickness Detection→CCD Detection&rarr ;winding